Case Study: HVAC Optimization in Office Building
Jun 28, 2026
Challenge
A 10-story office building in downtown Hanoi faced high energy costs and tenant complaints about air quality.
Solution
Deployed 120 Cabitek temperature and humidity sensors across all floors, integrated with the existing BMS for real-time HVAC control.
Results
Achieved 30% energy cost reduction within 6 months, improved tenant satisfaction, and earned green building certification.
